Why demolish a home: Demolishing a home or property can be done due to many possible reasons. One of the major reasons a home is demolished is when the cost of repairs and revamping the property outweighs the cost of demolishing the property and building a new one. In other words, a property is demolished when a newer or bigger property is set to be constructed on the location of the old building.
Types of home demolition: Home demolition can be complete or partial, depending on whether the entire property is being torn down, or a part of it is being demolished for the purpose of reconstruction. Complete demolition is often done when a new building is to be constructed. Whereas, partial demolition is done when the property is set to be reconstructed or revamped based on the original building.
Time taken for demolition: The time required for demolishing a property varies depending on the size and location of the property. An average sized house is usually demolished completely within a few days.
Cost of demolishing: Cost of demolition also depends largely on the type of building to be demolished as well as the location of the site, as these factors determine the type and number of equipment and personnel required for the demolition.
Requirements for home demolition: Before beginning the process of knocking down, certain requirements are to be met by the owner of the property.
Applying for the required demolition and reconstruction permits.
Ensuring adequate safety measures are in place to protect nearby buildings and structures.
Disconnecting existing services such as gas, electricity, water etc.
Making necessary arrangements for the clearance of debris and waste material from the area.
5 tips for home demolition:
Determination of the most suitable method for demolition: Different types of buildings have different forms of demolition suited for them. When a property is planned to be demolished completely, mechanical demolition is more suited for the job. It involves using of mechanized vehicles such as excavators to completely tear down the building. The debris from the site is then collected and disposed of. Deconstruction is a process which involves demolition by hand. It involves more labor and takes more time, therefore is more expensive. However, a large quantity of articles from the building is salvaged in this process and can be recycled or reused. In some cases, the demolition process involves initial deconstruction by hand labor before demolition by mechanical vehicles.
Choosing the correct contractor for the job: Necessary research should be undertaken before selection of a contractor for the home demolition. Different contractors specialize in different types of demolition, therefore the contractor most suited for the demolition of the type of property selected should be employed.
Inspection of the property by a professional: Before starting the process of home demolition, it is very important to have the property inspected by a professional. This helps in checking if any hazardous materials, such as asbestos or lead paint, are present in the building.
Taking necessary safety precautions: Before the start of the demolition process, necessary safety measures such as temporary fencing and protective nets should be put up in order to avoid creating a risk factor for the surrounding buildings and people.
Shutting off utility services: It is of utmost importance to shut down all utility services such as gas, electricity and water before commencing the process of demolition. Running electricity and gas services, during the process of home demolition, possesses a significant health risk for the workers as well as the surrounding general public.